Below you will find a number of our completed projects. Everything will be added over time. Would you like more information about a project? Feel free to contact us.
Click on the photo for more photos of the project
Our MIRROR WELDS

Update Roermond
π₯ Gas erop in Roermond π₯
Afgelopen week weer flink wat meters gemaakt! πͺπ½
Zo hebben we diverse aftakkingen van PE110 gemaakt, twee segmenten van PE250 geprefabriceerd en zijn we gestart met het Spiegellasseb van de PE315 leidingen inclusief Y- en T-stukken. π₯
Het weer werkte deze week helaas wat minder mee dan de week ervoor π§οΈπ . De tent kwam daardoor goed van pas en heeft ons regelmatig droog gehouden. Gelukkig laten we ons daardoor niet tegenhouden en werken we gewoon door aan een mooi stukje vakwerk. π
Wegens het gruwelijke slechte weer op einde van de dag geen overzicht foto van waar we gebleven zijn. π§οΈ π§οΈ π§οΈ
Trots op de voortgang van dit project! πͺπ
hashtag#PELeidingwerk hashtag#PE hashtag#PESDR11
hashtag#PlasticSolutions hashtag#Leidingwerk hashtag#Infra hashtag#PEProjecten hashtag#OmicronWT hashtag#GFMachiningSolutions hashtag#Spiegellassen hashtag#ButtFusionWelding hashtag#GFPipingSystemsNederland
Omicron Welding Technology GF Piping Systems Nederland Hecker | Infra Sloop Recycling Teun
Afgelopen week weer flink wat meters gemaakt! πͺπ½
Zo hebben we diverse aftakkingen van PE110 gemaakt, twee segmenten van PE250 geprefabriceerd en zijn we gestart met het Spiegellasseb van de PE315 leidingen inclusief Y- en T-stukken. π₯
Het weer werkte deze week helaas wat minder mee dan de week ervoor π§οΈπ . De tent kwam daardoor goed van pas en heeft ons regelmatig droog gehouden. Gelukkig laten we ons daardoor niet tegenhouden en werken we gewoon door aan een mooi stukje vakwerk. π
Wegens het gruwelijke slechte weer op einde van de dag geen overzicht foto van waar we gebleven zijn. π§οΈ π§οΈ π§οΈ
Trots op de voortgang van dit project! πͺπ
hashtag#PELeidingwerk hashtag#PE hashtag#PESDR11
hashtag#PlasticSolutions hashtag#Leidingwerk hashtag#Infra hashtag#PEProjecten hashtag#OmicronWT hashtag#GFMachiningSolutions hashtag#Spiegellassen hashtag#ButtFusionWelding hashtag#GFPipingSystemsNederland
Omicron Welding Technology GF Piping Systems Nederland Hecker | Infra Sloop Recycling Teun



















Dordrecht
π₯ Van krom naar recht π₯
Dinsdagmiddag kreeg ik een telefoontje met de vraag of ik donderdagmorgen βeven snelβ een flens op een buis kon lassen.
Klinkt simpel⦠tot blijkt dat er ook nog eens twee keer 45 graden tussen moeten, omdat de flens verder van de muur af moest komen.
Aan de hand van een foto van de situatie gaf ik direct aan dat ik minimaal 10 cm ruimte tussen buis en muur nodig had om mijn werk goed uit te kunnen voeren.
Snel alle materialen geregeld en vanochtend op locatie aangekomen.
Daar bleek de muur nog deels verwijderd te moeten worden. Toen dat gebeurd was, bleef er geen 10 cm over, maar slechts 8,3 cm.
Dat werd spannend, want mijn klem heeft minimaal 8,2 cm nodig. Bij de eerste las moest ik zelfs de buitenste ril verwijderen om de klem er ΓΌberhaupt nog tussenuit te krijgen.
βRecht instorten is toch niet zo moeilijk?β
Blijkbaar wel voor sommige bedrijven. π
Maar uiteindelijk draait het om oplossingen vinden waar anderen obstakels zien.
β Aansluiting voor de sprinklerinstallatie weer perfect waterpas
Daar doen we het voor πͺπ½πͺπ½πͺπ½
hashtag#Sprinklerinstallatie hashtag#Vakmanschap hashtag#PElassen hashtag#PE hashtag#spiegellassen hashtag#buttfusionwelding hashtag#pepipe hashtag#Werkplezier hashtag#Kunststofleidingen hashtag#omicronwt hashtag#GF hashtag#kunststof
Dinsdagmiddag kreeg ik een telefoontje met de vraag of ik donderdagmorgen βeven snelβ een flens op een buis kon lassen.
Klinkt simpel⦠tot blijkt dat er ook nog eens twee keer 45 graden tussen moeten, omdat de flens verder van de muur af moest komen.
Aan de hand van een foto van de situatie gaf ik direct aan dat ik minimaal 10 cm ruimte tussen buis en muur nodig had om mijn werk goed uit te kunnen voeren.
Snel alle materialen geregeld en vanochtend op locatie aangekomen.
Daar bleek de muur nog deels verwijderd te moeten worden. Toen dat gebeurd was, bleef er geen 10 cm over, maar slechts 8,3 cm.
Dat werd spannend, want mijn klem heeft minimaal 8,2 cm nodig. Bij de eerste las moest ik zelfs de buitenste ril verwijderen om de klem er ΓΌberhaupt nog tussenuit te krijgen.
βRecht instorten is toch niet zo moeilijk?β
Blijkbaar wel voor sommige bedrijven. π
Maar uiteindelijk draait het om oplossingen vinden waar anderen obstakels zien.
β Aansluiting voor de sprinklerinstallatie weer perfect waterpas
Daar doen we het voor πͺπ½πͺπ½πͺπ½
hashtag#Sprinklerinstallatie hashtag#Vakmanschap hashtag#PElassen hashtag#PE hashtag#spiegellassen hashtag#buttfusionwelding hashtag#pepipe hashtag#Werkplezier hashtag#Kunststofleidingen hashtag#omicronwt hashtag#GF hashtag#kunststof















Zandzuiger in Friesland
Vandaag dezelfde hobby als de rest van de week uitgevoerd, alleen deze keer 260 km van huis. π
De dag begon wel vroeg: om 07.00 uur afgesproken voor eerst een bakkie koffie β, daarna aan de slag.
Een verlengbuis van 355 SDR11 PE, maar liefst 110 meter lang, gemaakt voor een zandzuiger.
Weer een mooie klus afgerond en een tevreden gevoel aan het einde van de dag. π₯
hashtag#PElassen hashtag#PE hashtag#spiegellassen hashtag#buttfusionwelding hashtag#Zandzuiger hashtag#pepipe hashtag#Werkplezier hashtag#Kunststofleidingen hashtag#omicronwt hashtag#GF hashtag#kunststof
De dag begon wel vroeg: om 07.00 uur afgesproken voor eerst een bakkie koffie β, daarna aan de slag.
Een verlengbuis van 355 SDR11 PE, maar liefst 110 meter lang, gemaakt voor een zandzuiger.
Weer een mooie klus afgerond en een tevreden gevoel aan het einde van de dag. π₯
hashtag#PElassen hashtag#PE hashtag#spiegellassen hashtag#buttfusionwelding hashtag#Zandzuiger hashtag#pepipe hashtag#Werkplezier hashtag#Kunststofleidingen hashtag#omicronwt hashtag#GF hashtag#kunststof




















400 Roermond
π₯ 110 tot 450 π₯
Vandaag zijn we weer gestart met een geweldige klus! πͺ
Met leidingwerk 400 zijn we begonnen aan een mooi project waarbij de diameters variΓ«ren van 110 tot en met 450. π§
Het zonnetje liet zich vandaag ook weer goed zien βοΈ
Met 33 graden was het flink warm, maar dat mocht de pret niet drukken! πͺπ
Mooi om weer aan zoβn uitdagend project te werken en kwaliteit neer te zetten waar we trots op kunnen zijn. π₯
hashtag#PELeidingwerk hashtag#PE hashtag#pesdr11
hashtag#PlasticSolutions hashtag#Leidingwerk hashtag#Infra hashtag#Techniek hashtag#Projecten hashtag#Vakwerk
hashtag#omicronwt hashtag#GF GF Machining Solutions hashtag#spiegellassen hashtag#buttfusionwelding GF Piping Systems Nederland
Vandaag zijn we weer gestart met een geweldige klus! πͺ
Met leidingwerk 400 zijn we begonnen aan een mooi project waarbij de diameters variΓ«ren van 110 tot en met 450. π§
Het zonnetje liet zich vandaag ook weer goed zien βοΈ
Met 33 graden was het flink warm, maar dat mocht de pret niet drukken! πͺπ
Mooi om weer aan zoβn uitdagend project te werken en kwaliteit neer te zetten waar we trots op kunnen zijn. π₯
hashtag#PELeidingwerk hashtag#PE hashtag#pesdr11
hashtag#PlasticSolutions hashtag#Leidingwerk hashtag#Infra hashtag#Techniek hashtag#Projecten hashtag#Vakwerk
hashtag#omicronwt hashtag#GF GF Machining Solutions hashtag#spiegellassen hashtag#buttfusionwelding GF Piping Systems Nederland












Forza infra Eindhoven
Weer lekker bezig geweest in Eindhoven voor Forza Infra B.V. πͺ
In slechts 1,5 dag flink kunnen knallen en mooie stappen gezet. Het weer zit lekker mee, wat het werken nog net even beter maakt βοΈ
β‘οΈ Vooruitdenken en samen met Jermaine bespreken wat het beste plan van aanpak is πͺπ½ Dat maakt uiteindelijk het verschil op locatie.
Sterk werk neerzetten is een ding, maar je het samen maakt is het π₯.
Mooi om te werken met iemand met zoβn sterke instelling! Toppertjee πͺπ½β
Op naar de volgende! π
hashtag#infra hashtag#teamwork hashtag#pijpleidingen hashtag#kunststoflassen hashtag#PE
hashtag#infrastructuur hashtag#gf hashtag#Plasson hashtag#electrofusion hashtag#electrolasmof hashtag#buttfusionwelding hashtag#spiegellassen
hashtag#ondergrondseinfra hashtag#infralife
In slechts 1,5 dag flink kunnen knallen en mooie stappen gezet. Het weer zit lekker mee, wat het werken nog net even beter maakt βοΈ
β‘οΈ Vooruitdenken en samen met Jermaine bespreken wat het beste plan van aanpak is πͺπ½ Dat maakt uiteindelijk het verschil op locatie.
Sterk werk neerzetten is een ding, maar je het samen maakt is het π₯.
Mooi om te werken met iemand met zoβn sterke instelling! Toppertjee πͺπ½β
Op naar de volgende! π
hashtag#infra hashtag#teamwork hashtag#pijpleidingen hashtag#kunststoflassen hashtag#PE
hashtag#infrastructuur hashtag#gf hashtag#Plasson hashtag#electrofusion hashtag#electrolasmof hashtag#buttfusionwelding hashtag#spiegellassen
hashtag#ondergrondseinfra hashtag#infralife












EMZ Maasvlakte zuid
π§ Projectupdate | Maasvlakte
Weer of geen weerβ¦ wij lassen gewoon door! πͺ
Vandaag een stevig windje, windkracht 7 Γ 8, maar daar laten we ons niet door tegenhouden. Dankzij onze wind- en regenbeschutte Lascontainer gaat het werk onverminderd door.
Op de Maasvlakte waait het flink, met volle focus, vakmanschap. π₯
hashtag#portofrotterdam hashtag#swietelskyrailbenelux
hashtag#Maasvlakte hashtag#Projectupdate hashtag#PELassen hashtag#Vakmanschap hashtag#NoStop hashtag#Lascontainer hashtag#Lassen hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projecten hashtag#Samenwerken hashtag#EfficiΓ«ntie hashtag#Kwaliteit hashtag#Bouwplaats hashtag#Engineering hashtag#Teamwork hashtag#Voortgang hashtag#Geerdink hashtag#Innovatie hashtag#Engineering hashtag#Lassen hashtag#Trots
hashtag#GFwelding hashtag#GFspiegellassen hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#spiegellassen hashtag#Druklassen hashtag#buttfusionwelding
hashtag#GF250 hashtag#spiegellascontainer hashtag#container hashtag#piping
hashtag#PE De Jongh Pipesystems BV Omicron Welding Technology Geerdink Aannemersbedrijf B.V. GF Piping Systems
Weer of geen weerβ¦ wij lassen gewoon door! πͺ
Vandaag een stevig windje, windkracht 7 Γ 8, maar daar laten we ons niet door tegenhouden. Dankzij onze wind- en regenbeschutte Lascontainer gaat het werk onverminderd door.
Op de Maasvlakte waait het flink, met volle focus, vakmanschap. π₯
hashtag#portofrotterdam hashtag#swietelskyrailbenelux
hashtag#Maasvlakte hashtag#Projectupdate hashtag#PELassen hashtag#Vakmanschap hashtag#NoStop hashtag#Lascontainer hashtag#Lassen hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projecten hashtag#Samenwerken hashtag#EfficiΓ«ntie hashtag#Kwaliteit hashtag#Bouwplaats hashtag#Engineering hashtag#Teamwork hashtag#Voortgang hashtag#Geerdink hashtag#Innovatie hashtag#Engineering hashtag#Lassen hashtag#Trots
hashtag#GFwelding hashtag#GFspiegellassen hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#spiegellassen hashtag#Druklassen hashtag#buttfusionwelding
hashtag#GF250 hashtag#spiegellascontainer hashtag#container hashtag#piping
hashtag#PE De Jongh Pipesystems BV Omicron Welding Technology Geerdink Aannemersbedrijf B.V. GF Piping Systems





Maasvlakte South
π₯ Modification completed π₯
We had the pleasure of carrying out another great modification on the Emplacement Maasvlakte Zuid project.
Fitting, measuring, sawing, and welding β‘οΈβ‘οΈ everything came together to achieve this result. And let's be honest: it looks great again!
A piece of craftsmanship we can be proud of⦠even though it will eventually (unfortunately) disappear underground again.
Bruininx-Global, precision in plastic welding!
Geerdink Aannemersbedrijf B.V. ProRail Port of Rotterdam SWIETELSKY RAIL BENELUX B.V.
Omicron Welding Technology hashtag#PElassen hashtag#techniek hashtag#vakmanschap hashtag#bouw hashtag#uitgang hashtag#GF hashtag#omicronwt hashtag#lascontainer hashtag#vakmanschap hashtag#PE hashtag#PEpipeline
hashtag#buttfusionwelding hashtag#Spiegellassen
We had the pleasure of carrying out another great modification on the Emplacement Maasvlakte Zuid project.
Fitting, measuring, sawing, and welding β‘οΈβ‘οΈ everything came together to achieve this result. And let's be honest: it looks great again!
A piece of craftsmanship we can be proud of⦠even though it will eventually (unfortunately) disappear underground again.
Bruininx-Global, precision in plastic welding!
Geerdink Aannemersbedrijf B.V. ProRail Port of Rotterdam SWIETELSKY RAIL BENELUX B.V.
Omicron Welding Technology hashtag#PElassen hashtag#techniek hashtag#vakmanschap hashtag#bouw hashtag#uitgang hashtag#GF hashtag#omicronwt hashtag#lascontainer hashtag#vakmanschap hashtag#PE hashtag#PEpipeline
hashtag#buttfusionwelding hashtag#Spiegellassen






Firefighting line Lelystad
Another great job completed in Lelystad today! πͺ
For @gemaaltotaal, we successfully connected a PE355 SDR11 fire extinguishing line and a PE250 SDR17 fire extinguishing line today.
Everything connected neatly, job done! β
Always great to work together on reliable water and fire supplies.
#Lelystad #Projects #FireExtinguishingLine #PELine #Infratechnology #Craftsmanship #GF #gf500 #gf250 #omicronwt
For @gemaaltotaal, we successfully connected a PE355 SDR11 fire extinguishing line and a PE250 SDR17 fire extinguishing line today.
Everything connected neatly, job done! β
Always great to work together on reliable water and fire supplies.
#Lelystad #Projects #FireExtinguishingLine #PELine #Infratechnology #Craftsmanship #GF #gf500 #gf250 #omicronwt

Firefighting line Lelystad
Another great job completed in Lelystad today! πͺ
For @gemaaltotaal, we successfully connected a PE355 SDR11 fire extinguishing line and a PE250 SDR17 fire extinguishing line today.
Everything connected neatly, job done! β
Always great to work together on reliable water and fire supplies.
#Lelystad #Projects #FireExtinguishingLine #PELine #Infratechnology #Craftsmanship #GF #gf500 #gf250 #omicronwt
For @gemaaltotaal, we successfully connected a PE355 SDR11 fire extinguishing line and a PE250 SDR17 fire extinguishing line today.
Everything connected neatly, job done! β
Always great to work together on reliable water and fire supplies.
#Lelystad #Projects #FireExtinguishingLine #PELine #Infratechnology #Craftsmanship #GF #gf500 #gf250 #omicronwt













Gas Pipeline 200 Eersel
π§ Getting to work on a 200mm SDR11 high-pressure gas pipeline
Last week, I received a phone call asking if I could pitch in for a few days. A fellow welder was temporarily out of action due to personal circumstances, and naturally, you help out wherever you can.
Coincidentally, we recently drove through a nearby village where PE gas pipelines were being installed. I said back then: βNice work, so close to home for Bruininx-Global.β And so it became reality.
We are busy, but sometimes you have to shift things around to make the right things happen. Flexibility and collaboration β that is what we stand for at Bruininx-Global. ππ½πͺπ½
hashtag#welding hashtag#gaspipeline hashtag#collaboration hashtag#BruininxGlobal hashtag#gf hashtag#Gfwelding hashtag#Gfpiping hashtag#gf250 hashtag#gfwr200 hashtag#omicronwt hashtag#mirrorwelding hashtag#buttwelding hashtag#buttfusionwelding hashtag#200sdr11
Last week, I received a phone call asking if I could pitch in for a few days. A fellow welder was temporarily out of action due to personal circumstances, and naturally, you help out wherever you can.
Coincidentally, we recently drove through a nearby village where PE gas pipelines were being installed. I said back then: βNice work, so close to home for Bruininx-Global.β And so it became reality.
We are busy, but sometimes you have to shift things around to make the right things happen. Flexibility and collaboration β that is what we stand for at Bruininx-Global. ππ½πͺπ½
hashtag#welding hashtag#gaspipeline hashtag#collaboration hashtag#BruininxGlobal hashtag#gf hashtag#Gfwelding hashtag#Gfpiping hashtag#gf250 hashtag#gfwr200 hashtag#omicronwt hashtag#mirrorwelding hashtag#buttwelding hashtag#buttfusionwelding hashtag#200sdr11










Crane Lelystad
π§ Project Update Lelystad (Sunday)
On large construction projects, tight schedules and hard deadlines sometimes mean you have to make adjustments even on Sundays.
Today presented a nice challenge: the valve did not fit between the flanges. With fixed points, it required careful fitting and measuring, but thanks to two welds at 355 mm, the result is sleek once again.
πͺ Great teamwork and another step closer to delivery!
#projectupdate hashtag#construction hashtag#teamwork hashtag#welding hashtag#craftsmanship hashtag#mirrorwelding hashtag#plasticwelding hashtag#gf hashtag#pipingsystems hashtag#constructionproject hashtag#projectupdate hashtag#craftsmanship hashtag#teamwork hashtag#infra
hashtag#craftsmanship hashtag#teamwork hashtag#infrastructure hashtag#gfpiping hashtag#omicronwt
On large construction projects, tight schedules and hard deadlines sometimes mean you have to make adjustments even on Sundays.
Today presented a nice challenge: the valve did not fit between the flanges. With fixed points, it required careful fitting and measuring, but thanks to two welds at 355 mm, the result is sleek once again.
πͺ Great teamwork and another step closer to delivery!
#projectupdate hashtag#construction hashtag#teamwork hashtag#welding hashtag#craftsmanship hashtag#mirrorwelding hashtag#plasticwelding hashtag#gf hashtag#pipingsystems hashtag#constructionproject hashtag#projectupdate hashtag#craftsmanship hashtag#teamwork hashtag#infra
hashtag#craftsmanship hashtag#teamwork hashtag#infrastructure hashtag#gfpiping hashtag#omicronwt













Pressure sewer Veldhoven
π₯ Pressure Sewer Route Veldhoven β Project Update β
π₯
The final job of 2025: one with a bit of a smell⦠and plenty of mud.
The day was the moment: the pumping stations were shut down and we could get back to work. The relocated Γ250 mm pressure pipeline has been successfully connected to the existing route. A great milestone!
π Progress:
β Trenches dug
β Pipe lengths connected
β Pressure tested and connected to the existing pressure sewer
π Location: Veldhoven
π Diameter: Γ250 mm SDR17 PE pressure pipeline
We are keeping the pace high and the quality even higher. πͺ
hashtag#projectupdate hashtag#pressuresewer hashtag#fieldwork hashtag#PEwelding hashtag#plasticpipeline hashtag#mirrorwelding hashtag#teamwork hashtag#infrastructure
hashtag#buttwelding hashtag#pressurewelding hashtag#pepipeline hashtag#pe250sdr17 hashtag#pepipeline
hashtag#infra hashtag#civilengineering hashtag#pipework hashtag#plasticwelding hashtag#WorkInProgress
hashtag#PE250 hashtag#InfraTechnology hashtag#infraproject hashtag#gf hashtag#gfpipingsystems hashtag#omicronwt
hashtag#buttfusionwelding
The final job of 2025: one with a bit of a smell⦠and plenty of mud.
The day was the moment: the pumping stations were shut down and we could get back to work. The relocated Γ250 mm pressure pipeline has been successfully connected to the existing route. A great milestone!
π Progress:
β Trenches dug
β Pipe lengths connected
β Pressure tested and connected to the existing pressure sewer
π Location: Veldhoven
π Diameter: Γ250 mm SDR17 PE pressure pipeline
We are keeping the pace high and the quality even higher. πͺ
hashtag#projectupdate hashtag#pressuresewer hashtag#fieldwork hashtag#PEwelding hashtag#plasticpipeline hashtag#mirrorwelding hashtag#teamwork hashtag#infrastructure
hashtag#buttwelding hashtag#pressurewelding hashtag#pepipeline hashtag#pe250sdr17 hashtag#pepipeline
hashtag#infra hashtag#civilengineering hashtag#pipework hashtag#plasticwelding hashtag#WorkInProgress
hashtag#PE250 hashtag#InfraTechnology hashtag#infraproject hashtag#gf hashtag#gfpipingsystems hashtag#omicronwt
hashtag#buttfusionwelding











Maasvlakte
π§ Coupling welding on location β Maasvlakte Project
Mirror welding work in the field at the Maasvlakte.
Material: PE 250 SDR11
Machines: GF 250 and repair clamp
Great work in a challenging environment, with a focus on quality and precision πͺ
hashtag#Maasvlakte hashtag#Rotterdam hashtag#Firefightingpipeline hashtag#Plastic hashtag#PlasticWelding hashtag#MirrorWelding hashtag#PEPipeline hashtag#Infra hashtag#Industry hashtag#Port hashtag#Projects hashtag#Safety hashtag#Reliability hashtag#Quality hashtag#Collaboration hashtag#BruininxGlobal hashtag#gf hashtag#omicronwt hashtag#InfraProjects
hashtag#Technology Omicron Welding Technology GF Piping Systems Geerdink Aannemersbedrijf B.V. SWIETELSKY RAIL BENELUX B.V. De Jongh Pipesystems BV
Mirror welding work in the field at the Maasvlakte.
Material: PE 250 SDR11
Machines: GF 250 and repair clamp
Great work in a challenging environment, with a focus on quality and precision πͺ
hashtag#Maasvlakte hashtag#Rotterdam hashtag#Firefightingpipeline hashtag#Plastic hashtag#PlasticWelding hashtag#MirrorWelding hashtag#PEPipeline hashtag#Infra hashtag#Industry hashtag#Port hashtag#Projects hashtag#Safety hashtag#Reliability hashtag#Quality hashtag#Collaboration hashtag#BruininxGlobal hashtag#gf hashtag#omicronwt hashtag#InfraProjects
hashtag#Technology Omicron Welding Technology GF Piping Systems Geerdink Aannemersbedrijf B.V. SWIETELSKY RAIL BENELUX B.V. De Jongh Pipesystems BV



Baarlo casing pipes
πͺπ½ Need to switch gears quickly? No problem at Bruininx-Global! πͺπ½
Friday afternoon, 4:45 PM.
The phone rings:
βCan you weld a few 250mm protective tubes on Tuesday?β
As always at Bruininx-Global:
YES, that is definitely possible! π₯
So, we quickly rearranged the schedule, arranged the equipment, and called Omicron Welding Technology for an inner bead scraper (because normally I don't work with protective tubes).
By Monday, they were already neatly on site in Rotterdam β perfectly arranged πͺπ½
Yesterday was the day.
Arrived in Baarlo at 7:00 AM, but what happened?
π No crane available π
So, quick thinking again: called Bas Jansen from Jansen Verhuur to see if they could deliver a small crane urgently. And sure enough, at 10:00 AM an 8-ton truck was on the doorstep β 1.5 hours from home! What a powerhouse β€οΈβπ₯
After that, we worked full throttle.
By 10:00 PM the work was finished and the pipes were neatly laid out.
Today, VTV Drilling can pull them in nicely.
Everything well ahead of time, as it should be. π
Was it tough? Definitely.
Doing it yourself: pulling through, mirroring, removing the beading, and laying pipes β thatβs a real grind.
But heyβ¦ everything worked out again! π₯
π If Bruininx-Global does it, itβs sure to turn out well! πͺπ½
hashtag#BruininxGlobal hashtag#Projects hashtag#Teamwork hashtag#Infra hashtag#pepipe hashtag#pe hashtag#gf hashtag#omicronwt hashtag#mirrorwelding hashtag#buttwelding hashtag#butfusionwelding hashtag#drilling Anton Van der Weijden VTV Drilling Omicron Welding Technology Bas Jansen @jansenverhuurbergeijk
hashtag#no9to4mentality
Friday afternoon, 4:45 PM.
The phone rings:
βCan you weld a few 250mm protective tubes on Tuesday?β
As always at Bruininx-Global:
YES, that is definitely possible! π₯
So, we quickly rearranged the schedule, arranged the equipment, and called Omicron Welding Technology for an inner bead scraper (because normally I don't work with protective tubes).
By Monday, they were already neatly on site in Rotterdam β perfectly arranged πͺπ½
Yesterday was the day.
Arrived in Baarlo at 7:00 AM, but what happened?
π No crane available π
So, quick thinking again: called Bas Jansen from Jansen Verhuur to see if they could deliver a small crane urgently. And sure enough, at 10:00 AM an 8-ton truck was on the doorstep β 1.5 hours from home! What a powerhouse β€οΈβπ₯
After that, we worked full throttle.
By 10:00 PM the work was finished and the pipes were neatly laid out.
Today, VTV Drilling can pull them in nicely.
Everything well ahead of time, as it should be. π
Was it tough? Definitely.
Doing it yourself: pulling through, mirroring, removing the beading, and laying pipes β thatβs a real grind.
But heyβ¦ everything worked out again! π₯
π If Bruininx-Global does it, itβs sure to turn out well! πͺπ½
hashtag#BruininxGlobal hashtag#Projects hashtag#Teamwork hashtag#Infra hashtag#pepipe hashtag#pe hashtag#gf hashtag#omicronwt hashtag#mirrorwelding hashtag#buttwelding hashtag#butfusionwelding hashtag#drilling Anton Van der Weijden VTV Drilling Omicron Welding Technology Bas Jansen @jansenverhuurbergeijk
hashtag#no9to4mentality


















Prefab
GF en prefab: de perfecte combinatie.
Tussendoor hebben we prefab onderdelen geproduceerd voor de klant.
Altijd met hetzelfde doel voor ogen: service en kwaliteit op het hoogste niveau.
Geen concessies. Gewoon goed werk. πͺπ½πͺπ½πͺπ½
hashtag#GF
hashtag#Prefab
hashtag#Kwaliteit
hashtag#Service
hashtag#Vakmanschap
hashtag#Betrouwbaarheid
hashtag#Bouw
hashtag#Productie
Tussendoor hebben we prefab onderdelen geproduceerd voor de klant.
Altijd met hetzelfde doel voor ogen: service en kwaliteit op het hoogste niveau.
Geen concessies. Gewoon goed werk. πͺπ½πͺπ½πͺπ½
hashtag#GF
hashtag#Prefab
hashtag#Kwaliteit
hashtag#Service
hashtag#Vakmanschap
hashtag#Betrouwbaarheid
hashtag#Bouw
hashtag#Productie





Lelystad
π§ Saturday job in Lelystad π₯
Today we completed another nice job:
connecting two fire extinguishing lines: one of 250 SDR17 and one of 355 SDR11.
Everything completed neatly and on time β so that construction can continue without delay.
It is great to see how collaboration and craftsmanship ensure that work keeps going, even on weekends.
hashtag#teamwork hashtag#craftsmanship hashtag#construction hashtag#firefightingpipeline hashtag#Lelystad hashtag#Weldingcontainer hashtag#Welding hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projects hashtag#Collaboration hashtag#Efficiency hashtag#Quality hashtag#Construction site hashtag#Engineering hashtag#Teamwork hashtag#Progress hashtag#Welding hashtag#Pride
hashtag#GFwelding hashtag#GFmirrorwelding hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#mirrorwelding hashtag#Pressurewelding hashtag#buttfusionwelding hashtag#GF250 hashtag#gf400 hashtag#piping
hashtag#PE
Today we completed another nice job:
connecting two fire extinguishing lines: one of 250 SDR17 and one of 355 SDR11.
Everything completed neatly and on time β so that construction can continue without delay.
It is great to see how collaboration and craftsmanship ensure that work keeps going, even on weekends.
hashtag#teamwork hashtag#craftsmanship hashtag#construction hashtag#firefightingpipeline hashtag#Lelystad hashtag#Weldingcontainer hashtag#Welding hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projects hashtag#Collaboration hashtag#Efficiency hashtag#Quality hashtag#Construction site hashtag#Engineering hashtag#Teamwork hashtag#Progress hashtag#Welding hashtag#Pride
hashtag#GFwelding hashtag#GFmirrorwelding hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#mirrorwelding hashtag#Pressurewelding hashtag#buttfusionwelding hashtag#GF250 hashtag#gf400 hashtag#piping
hashtag#PE










Maasvlakte Start
π Project kick-off at the Maasvlakte!
Today, we officially started a major project for Geerdink Aannemersbedrijf B.V. with our new welding container.
A beautiful location, a challenging job, and a great opportunity to show what we are capable of.
βοΈ Welding: PE250 SDR11
βοΈ Productivity: 2 strands per pass
With this new step, we are not only increasing our capacity but also focusing on quality and efficiency.
We look forward to making this project a success together with Geerdink! πͺπ½π₯ hashtag#teamwork hashtag#proudoftheteam
hashtag#Projectstart hashtag#Maasvlakte hashtag#Weldingcontainer hashtag#Welding hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projects hashtag#Collaboration hashtag#Efficiency hashtag#Quality hashtag#Constructionsite hashtag#Engineering hashtag#Teamwork hashtag#Progress hashtag#Geerdink hashtag#Innovation hashtag#Engineering hashtag#Welding hashtag#Proud
hashtag#GFwelding hashtag#GFmirrorwelding hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#mirrorwelding hashtag#Pressurewelding hashtag#buttfusionwelding hashtag#GF250 hashtag#mirrorweldingcontainer hashtag#container hashtag#piping
hashtag#PE
Today, we officially started a major project for Geerdink Aannemersbedrijf B.V. with our new welding container.
A beautiful location, a challenging job, and a great opportunity to show what we are capable of.
βοΈ Welding: PE250 SDR11
βοΈ Productivity: 2 strands per pass
With this new step, we are not only increasing our capacity but also focusing on quality and efficiency.
We look forward to making this project a success together with Geerdink! πͺπ½π₯ hashtag#teamwork hashtag#proudoftheteam
hashtag#Projectstart hashtag#Maasvlakte hashtag#Weldingcontainer hashtag#Welding hashtag#PE250 hashtag#SDR11 hashtag#Infra hashtag#Projects hashtag#Collaboration hashtag#Efficiency hashtag#Quality hashtag#Constructionsite hashtag#Engineering hashtag#Teamwork hashtag#Progress hashtag#Geerdink hashtag#Innovation hashtag#Engineering hashtag#Welding hashtag#Proud
hashtag#GFwelding hashtag#GFmirrorwelding hashtag#GFpipingsystems hashtag#GF hashtag#Omicron hashtag#Omicronwt hashtag#mirrorwelding hashtag#Pressurewelding hashtag#buttfusionwelding hashtag#GF250 hashtag#mirrorweldingcontainer hashtag#container hashtag#piping
hashtag#PE









Enexis gas pipeline
#GF cnc 4.0 π
Fully automatic welding with the GF CNC 4.0
What an amazing machine! Thanks to this modern technology, the entire welding process runs fully automatically, precisely according to protocol, and with full registration.
We are currently working on a 160 SDR11 high-pressure gas pipeline commissioned by Hurkmans / Enexis. As always, we also perform the necessary test welds directly from the work site to ensure quality.
With these kinds of innovative solutions, we are taking another step forward in safety, reliability, and efficiency within our projects. π
hashtag#GFwelding
hashtag#GFspiegellassen
hashtag#GFpipingsystems
hashtag#GF
hashtag#Omicron
hashtag#Omicronwt
hashtag#spiegellassen
hashtag#Druklassen
hashtag#buttfusionwelding
hashtag#GF160cnc
hashtag#GF160
hashtag#piping
hashtag#PE
GF Piping Systems GF Piping Systems Italia GF Machining Solutions Omicron Welding Technology Enexis Hurkmans Groep | Hurkmans | Ockhuizen | Mart Geers | Holland Drilling
Fully automatic welding with the GF CNC 4.0
What an amazing machine! Thanks to this modern technology, the entire welding process runs fully automatically, precisely according to protocol, and with full registration.
We are currently working on a 160 SDR11 high-pressure gas pipeline commissioned by Hurkmans / Enexis. As always, we also perform the necessary test welds directly from the work site to ensure quality.
With these kinds of innovative solutions, we are taking another step forward in safety, reliability, and efficiency within our projects. π
hashtag#GFwelding
hashtag#GFspiegellassen
hashtag#GFpipingsystems
hashtag#GF
hashtag#Omicron
hashtag#Omicronwt
hashtag#spiegellassen
hashtag#Druklassen
hashtag#buttfusionwelding
hashtag#GF160cnc
hashtag#GF160
hashtag#piping
hashtag#PE
GF Piping Systems GF Piping Systems Italia GF Machining Solutions Omicron Welding Technology Enexis Hurkmans Groep | Hurkmans | Ockhuizen | Mart Geers | Holland Drilling










Lelystad
π§ Project Lelystad β JYSK Distribution Center
A few days ago, I received a call asking if I had time to make three Γ250 SDR17 welds in Lelystad. βWeβll make time for that,β I thought.
No sooner said than done: today at 7:00 AM, I was at the construction site. And what a construction site! I have never worked on such a large project before: the new JYSK distribution center, which is currently under construction. ποΈ
Today was all about connecting the Γ250 SDR17 fire extinguishing pipe. In the end, it turned out not to be three welds, but eleven. πͺ
And the pressure was really on: everything has to be finished this weekend, because the road on the construction site MUST be open again on Monday. Tomorrow I will return to make an adjustment to the Γ355 fire extinguishing pipe, because the fire hydrant does not fit in between yet.
π Update to follow!
#PELeiding hashtag#Blusleiding hashtag#Lelystad hashtag#Distributiecentrum hashtag#JYSK hashtag#Lassen hashtag#Projecten hashtag#Infra hashtag#kunststoflassen
hashtag#GF hashtag#GFmachine hashtag#PE250 hashtag#SDR17
hashtag#omicronwt hashtag#spiegellassen hashtag#Druklassen hashtag#Stuilassen hashtag#buttfusionwelding hashtag#indemudder
A few days ago, I received a call asking if I had time to make three Γ250 SDR17 welds in Lelystad. βWeβll make time for that,β I thought.
No sooner said than done: today at 7:00 AM, I was at the construction site. And what a construction site! I have never worked on such a large project before: the new JYSK distribution center, which is currently under construction. ποΈ
Today was all about connecting the Γ250 SDR17 fire extinguishing pipe. In the end, it turned out not to be three welds, but eleven. πͺ
And the pressure was really on: everything has to be finished this weekend, because the road on the construction site MUST be open again on Monday. Tomorrow I will return to make an adjustment to the Γ355 fire extinguishing pipe, because the fire hydrant does not fit in between yet.
π Update to follow!
#PELeiding hashtag#Blusleiding hashtag#Lelystad hashtag#Distributiecentrum hashtag#JYSK hashtag#Lassen hashtag#Projecten hashtag#Infra hashtag#kunststoflassen
hashtag#GF hashtag#GFmachine hashtag#PE250 hashtag#SDR17
hashtag#omicronwt hashtag#spiegellassen hashtag#Druklassen hashtag#Stuilassen hashtag#buttfusionwelding hashtag#indemudder












PVC to PE
π₯ PVC to PEπ₯
For a client, we recently replaced a PVC pipe that was connected to a PE pipe using a slip-on coupling.
The PVC proved unable to withstand the pressure shocks from the irrigation pump and ruptured as a result.
β Solution: the entire section β from the pump to the directional drilling β was executed in PE.
The result? A robust, flexible, and low-maintenance piping solution that effortlessly absorbs the load.
π§ Sometimes, replacing entirely with PE is simply the best choice for reliability and lifespan.
#PE #PVC #irrigation #sustainablesolutions #project
#mirrorwelding #pressurewelding
##buttwelding #GF #GFwelding #gorgefisher GF Piping Systems GF Machining Solutions
For a client, we recently replaced a PVC pipe that was connected to a PE pipe using a slip-on coupling.
The PVC proved unable to withstand the pressure shocks from the irrigation pump and ruptured as a result.
β Solution: the entire section β from the pump to the directional drilling β was executed in PE.
The result? A robust, flexible, and low-maintenance piping solution that effortlessly absorbs the load.
π§ Sometimes, replacing entirely with PE is simply the best choice for reliability and lifespan.
#PE #PVC #irrigation #sustainablesolutions #project
#mirrorwelding #pressurewelding
##buttwelding #GF #GFwelding #gorgefisher GF Piping Systems GF Machining Solutions









TU Delft PP-R
π₯ UPDATE Mirror Welding Aquatherm Blue Pipe β Final Welding Session π₯
Today, we performed the final 15 mirror welds on the Aquatherm Energyblue system for Forza Infra B.V. πͺπ½
The +GF+ 500 and 400 machines were used again for this:
πΉ 500 machine with insert shells Γ355 mm
πΉ 400 machine with insert shells Γ250 mm
β’ 250/400 mm PPR OT / PE (SDR11)
β’ 355/500 mm PPR / PE (SDR17.6)
All welds were performed in accordance with procedure, with correct cooling times and visual inspection. The OT layer on the 250 mm pipes was carefully peeled off prior to welding, as required. π οΈ With this, the welding work for this project is completed.βοΈ
Thanks again to Van Vulpen Doxta Group, @smitskraanverhuur, Jaap de Jong and his team, and Forza Infra B.V. β top-notch collaboration, as always.
One team, one task. β
hashtag#Mirror welding hashtag#Aquatherm hashtag#PElassen hashtag#ForzaInfra hashtag#BruininxGlobal
hashtag#GFwelding
hashtag#GFspiegellassen
hashtag#GFpipingsystems
hashtag#GF
hashtag#Omicron
hashtag#Omicronwt
hashtag#spiegellassen
hashtag#Printing classes
hashtag#buttfusionwelding
hashtag#GF400
hashtag#GF500
hashtag#piping
hashtag#PE
hashtag#PPR
hashtag#AquathermBluePipe
GF Piping Systems GF Machining Solutions Omicron Welding Technology
Today, we performed the final 15 mirror welds on the Aquatherm Energyblue system for Forza Infra B.V. πͺπ½
The +GF+ 500 and 400 machines were used again for this:
πΉ 500 machine with insert shells Γ355 mm
πΉ 400 machine with insert shells Γ250 mm
β’ 250/400 mm PPR OT / PE (SDR11)
β’ 355/500 mm PPR / PE (SDR17.6)
All welds were performed in accordance with procedure, with correct cooling times and visual inspection. The OT layer on the 250 mm pipes was carefully peeled off prior to welding, as required. π οΈ With this, the welding work for this project is completed.βοΈ
Thanks again to Van Vulpen Doxta Group, @smitskraanverhuur, Jaap de Jong and his team, and Forza Infra B.V. β top-notch collaboration, as always.
One team, one task. β
hashtag#Mirror welding hashtag#Aquatherm hashtag#PElassen hashtag#ForzaInfra hashtag#BruininxGlobal
hashtag#GFwelding
hashtag#GFspiegellassen
hashtag#GFpipingsystems
hashtag#GF
hashtag#Omicron
hashtag#Omicronwt
hashtag#spiegellassen
hashtag#Printing classes
hashtag#buttfusionwelding
hashtag#GF400
hashtag#GF500
hashtag#piping
hashtag#PE
hashtag#PPR
hashtag#AquathermBluePipe
GF Piping Systems GF Machining Solutions Omicron Welding Technology









Pressure sewer Veldhoven
π₯ Pressure Sewer Route Veldhoven β Update π₯
Last week, the trenches were dug and the long lengths of Γ250 mm PE pipe were successfully connected. We are ready for the next step: pressure testing the pipeline!
π§ Project Update β Γ250 Pressure Sewer Veldhoven
In just three days, we prepared the long lengths of Γ250 PE on site and have now neatly connected them in place. Thanks to tight planning and preparation, everything is running according to schedule.
π Progress:
β Trenches dug
β Lengths connected
β³ Next step: Pressure testing and subsequent connection to existing pressure sewer
π Location: Veldhoven
π Diameter: Γ250 mm PE pressure pipe
We are keeping the pace high and the quality even higher.
On to the next phase! πͺ
hashtag#projectupdate hashtag#pressuresewer hashtag#fieldwork hashtag#PEwelding hashtag#plasticpipeline hashtag#mirrorwelding hashtag#teamwork hashtag#infrastructure hashtag#buttwelding hashtag#mirrorwelding hashtag#pressurewelding
hashtag#pepipeline hashtag#pe250sdr17 hashtag#pepipeline
hashtag#Infra hashtag#CivilEngineering hashtag#Piping
hashtag#PlasticWelding hashtag#PlasticPipes
hashtag#WorkInProgress hashtag#PE250 hashtag#InfraTechnology hashtag#infraproject hashtag#gf hashtag#gfpipingsystems
hashtag#omicronwt
Last week, the trenches were dug and the long lengths of Γ250 mm PE pipe were successfully connected. We are ready for the next step: pressure testing the pipeline!
π§ Project Update β Γ250 Pressure Sewer Veldhoven
In just three days, we prepared the long lengths of Γ250 PE on site and have now neatly connected them in place. Thanks to tight planning and preparation, everything is running according to schedule.
π Progress:
β Trenches dug
β Lengths connected
β³ Next step: Pressure testing and subsequent connection to existing pressure sewer
π Location: Veldhoven
π Diameter: Γ250 mm PE pressure pipe
We are keeping the pace high and the quality even higher.
On to the next phase! πͺ
hashtag#projectupdate hashtag#pressuresewer hashtag#fieldwork hashtag#PEwelding hashtag#plasticpipeline hashtag#mirrorwelding hashtag#teamwork hashtag#infrastructure hashtag#buttwelding hashtag#mirrorwelding hashtag#pressurewelding
hashtag#pepipeline hashtag#pe250sdr17 hashtag#pepipeline
hashtag#Infra hashtag#CivilEngineering hashtag#Piping
hashtag#PlasticWelding hashtag#PlasticPipes
hashtag#WorkInProgress hashtag#PE250 hashtag#InfraTechnology hashtag#infraproject hashtag#gf hashtag#gfpipingsystems
hashtag#omicronwt














PPR TU Delft










Veldhoven
π₯ Pressure sewer route π₯
Project update β Pressure sewer Γ250 Veldhoven
In just three days, we successfully prepared the long lengths of Γ250 mm PE pipes for this pressure sewer section on site.
The trench will be excavated shortly, after which we will immediately connect the preparatory sections according to schedule. Thanks to the tight preparation, we can proceed efficiently as soon as the earthworks are complete.
β Progress: Long lengths ready
π Next step: Excavating trench and welding lengths
π Location: Veldhoven
π Diameter: Γ250 mm pressure pipe (PE)
We are keeping the pace high and the quality sharp! hashtag#buttwelding
hashtag#mirrorwelding
hashtag#pressureweldingb
hashtag#pepipeline
hashtag#pe250sdr17
hashtag#pepipeline
hashtag#Infra
hashtag#CivilEngineering
hashtag#Piping
hashtag#PressureSewer
hashtag#PlasticWelding
hashtag#PEwelding
hashtag#PlasticPipes
hashtag#ProjectUpdate
hashtag#WorkInProgress
hashtag#PE250
hashtag#InfraTechnology
hashtag#infraproject
hashtag#gf
hashtag#gfpipingsystems
GF Piping Systems Netherlands
Project update β Pressure sewer Γ250 Veldhoven
In just three days, we successfully prepared the long lengths of Γ250 mm PE pipes for this pressure sewer section on site.
The trench will be excavated shortly, after which we will immediately connect the preparatory sections according to schedule. Thanks to the tight preparation, we can proceed efficiently as soon as the earthworks are complete.
β Progress: Long lengths ready
π Next step: Excavating trench and welding lengths
π Location: Veldhoven
π Diameter: Γ250 mm pressure pipe (PE)
We are keeping the pace high and the quality sharp! hashtag#buttwelding
hashtag#mirrorwelding
hashtag#pressureweldingb
hashtag#pepipeline
hashtag#pe250sdr17
hashtag#pepipeline
hashtag#Infra
hashtag#CivilEngineering
hashtag#Piping
hashtag#PressureSewer
hashtag#PlasticWelding
hashtag#PEwelding
hashtag#PlasticPipes
hashtag#ProjectUpdate
hashtag#WorkInProgress
hashtag#PE250
hashtag#InfraTechnology
hashtag#infraproject
hashtag#gf
hashtag#gfpipingsystems
GF Piping Systems Netherlands















ASML
π₯ Gas er op π₯
Voor een regionale opdrachtgever een uitdagend project uitgevoerd in Eindhoven.
Het leidingtracΓ© liep over een complex terrein met beperkte werkruimte, waaronder diverse obstakels en smalle sleuven.
De PE-leidingen zijn inmiddels gelegd en grotendeels afgerond. Binnenkort volgen nog de spiegellasverbindingen voor de overgangsstukken van PE naar staal, inclusief aansluiting op de generatorinstallaties
hashtag#stuiklassen
hashtag#spiegellassen
hashtag#Buttfusionwelding
hashtag#buttwelding
hashtag#kunststoflassen
hashtag#PE
hashtag#PEpipeline
hashtag#PEsdr11
hashtag#gastec
hashtag#NEN7200
Voor een regionale opdrachtgever een uitdagend project uitgevoerd in Eindhoven.
Het leidingtracΓ© liep over een complex terrein met beperkte werkruimte, waaronder diverse obstakels en smalle sleuven.
De PE-leidingen zijn inmiddels gelegd en grotendeels afgerond. Binnenkort volgen nog de spiegellasverbindingen voor de overgangsstukken van PE naar staal, inclusief aansluiting op de generatorinstallaties
hashtag#stuiklassen
hashtag#spiegellassen
hashtag#Buttfusionwelding
hashtag#buttwelding
hashtag#kunststoflassen
hashtag#PE
hashtag#PEpipeline
hashtag#PEsdr11
hashtag#gastec
hashtag#NEN7200












bottom of page